|
|
|
|
(OIM) Offshore Installation Manager – Drillship
|
Архивная вакансия
от 21.08.2010 |
Компания:
Направления деятельности:
Бурение
Регионы работы:
за пределами России
|
|
|
|
|
We are currently seeking an OIM The position is on a Semi-submersible rig (conventional, anchor handling, not DP based), presently located in Iran. The role is a permanent(contract) staff position. Crew would be paid only for work days (days on) not days at home (days off). Experience on semi-submersible rig or drillship required. Responsible for the Safety, Health and Welfare of all persons and for the Environmental Safety within the field. Responsible for the safe and efficient Offshore operation and for maintaining the technical integrity Responsible for ensuring Production requirements and safe operating practices comply with the Facility management system while meeting all environmental and legislative requirements Liaise with Onshore Management and support groups ensuring good communication levels are maintained and assist in project planning related to offshore activities. •7. Conversant with all relevant safety codes and operating Instructions ensuring that these are followed and improved to ensure the safety of all operations is maintained. In conjunction with onshore support groups assist in planning and coordinating major activities. Familiar with all limitations to the technical integrity of the facility and conversant with inspection activities required to ensure the integrity of the facility. Responsible for ensuring that offshore training requirement for facility personnel are met with any inadequacies being addressed in consultation with onshore support groups as required. . Oversee activities and operational work programmes supervised by the Marine, Maintenance and Production Supervisors. Ensuring that their operation and work activity is performed in accordance with the applicable Management System Instructions and Regulatory Compliance. In conjunction with Onshore Managers, ensure that the numbers, skills and competency of those onboard is sufficient to meet Installation and legislative requirements and develop to the needs of the operation. Monitor and assess the performance of Offshore Personnel in conjunction with Onshore Managers. Identify and agree training or development plans for individuals. Ensure that all contractors and vendors who perform standard and specialist work on the facility are made aware of their responsibilities for managing health, safety and emergency response. Manage, control, approve and monitor the Permit to Work System, ensuring that the requirements for generating and using Permits for Hot Work, Cold Work, Confined Space Entry are implemented in accordance with MSM Instructions. Undertake safety inspections of plant, equipment, machinery and process in accordance with the schedules in the MSM Site Safety Inspection Instruction Co-ordinate and control the facility operational work programmes to ensure Simultaneous Operations with high risk potential are managed in accordance with the MSM Instruction. Five years of work experience as Offshore Installation Manager, Production Supervisor, Marine Superintendent or Maintenance Superintendent. Experienced in Safety Supervision Day rate when working 450 EUR
|
|
|
|
|
|
|
|
|
|
|
Оцените вакансию |
|
0 из 5 |
0 |
4544 |
рейтинг |
голосов |
просмотров |
|
|
|
|
|
|
|
|